Installing Shared Water Backup in a Sectional Title Scheme: Resolutions and Approvals

By the WaterQuotes team · Published 2026-11-13 · 7 min read

Flat illustration of a sectional title block with a water tank and a ballot paper showing a vote tally

Installing shared water backup in a sectional title scheme feels urgent the moment the municipal supply fails for the third time in a month. It is tempting to let the trustee chairperson call an installer, get a quote and move. That shortcut creates real legal exposure. The Community Schemes Ombud Service (CSOS) regularly handles disputes that trace back to expenditure approved without the correct resolution — and the consequences can range from invalid contracts to personal liability for trustees. This guide walks through which resolution applies, what the notice must contain, and the traps worth knowing before anyone signs anything.

Why the Approval Step Is Not Optional

Sectional title schemes operate under the Sectional Titles Schemes Management Act (STSMA) and the Prescribed Management Rules (PMRs) that sit beneath it. The Act draws a clear line between expenditure the trustees can authorise in the normal course of management and expenditure that requires owners to vote. Installing a water storage or backup system — tanks, pumps, pressure vessels, a borehole — almost always crosses that line, for two reasons.

First, the capital cost. Backup tank-and-pump systems typically run R20,000–R40,000 for smaller installations; whole-house or whole-building examples are often quoted around R55,000, and those are Johannesburg reference points. Costs in other cities can differ, so request local quotes before budgeting. Figures like these normally exceed whatever threshold the scheme’s budget sets for unilateral trustee spending.

Second, the nature of the work. Adding infrastructure that did not exist before — whether a tank platform on common property or a pump room — is generally treated as an improvement to common property rather than maintenance. That distinction matters because improvements require a higher level of owner consent than routine repairs.

For schemes that have adopted a maintenance, repair and replacement plan (which the STSMA requires), unapproved capital additions outside that plan carry additional risk. If the installed system later causes damage or a dispute arises over running costs, trustees who acted without proper authority may find themselves personally exposed.

Special Resolution vs Unanimous Resolution: Which Applies?

The STSMA and PMRs recognise several resolution types. For water backup, the two most relevant are:

Special resolution requires at least 75% of the value of the votes of all members (not just those present) and no more than 25% of the total vote value opposing it. It is the standard threshold for improvements to common property.

Unanimous resolution requires that all members vote in favour, or that those who do not vote are deemed to agree because no written objection was received within the specified period. Unanimous resolutions are required when the scheme wants to change the rules themselves — for instance, to give the trustees permanent authority to approve backup-water expenditure up to a higher cap.

In practice, most schemes installing a first-time water tank or borehole need a special resolution. If the work involves changing the management rules (say, to create a levy specifically for ongoing pump-maintenance costs), that element requires a unanimous resolution passed separately.

Check your scheme’s registered management rules first. Some schemes have already amended their rules to allow trustees broader infrastructure spending authority; others have stricter thresholds. The CSOS website (csos.org.za) publishes guidance notes on resolution types and the PMRs are available on gov.za.

What the Notice Must Include

A resolution only holds if the meeting was properly convened. The PMRs specify minimum notice periods — typically 30 days for a general meeting where a special resolution is on the agenda, though your scheme’s rules may require longer. The notice must:

  • State the date, time and venue (or virtual-meeting link) clearly.
  • Set out the proposed resolution in full, word for word as it will be put to the vote.
  • Include a written motivation — what the system will do, why it is needed, and the financial implication per unit owner.
  • Attach at least one written quote. Attaching two or three vetted quotes is better practice; it demonstrates due diligence and reduces the chance of a later challenge that the trustees acted without comparing the market.
  • State the ongoing cost implications: electricity for pumps, maintenance contracts, water-quality testing, and how those costs will be recovered (special levy, operational levy adjustment, or otherwise).

Leaving out the financial annexure is the single most common drafting error. Owners who argue they did not know the full cost can successfully challenge the resolution at the CSOS, even if the vote count was correct.

Common Traps That Invalidate Resolutions

Wrong meeting type. A special resolution cannot be passed by round-robin written consent in the same way a simple majority resolution can. If trustees circulate a sign-off sheet rather than convening a proper meeting, the resolution is likely invalid.

Short notice. Sending a 14-day notice when 30 days is required voids the resolution regardless of how many owners voted yes.

Vague wording. A resolution that approves “water storage infrastructure” without specifying the capacity, location, and cost ceiling leaves room for scope creep and later dispute about what was actually approved.

No proxy provision. Owners who cannot attend should be given a proxy form with the notice. If the meeting is quorate only because proxies were counted informally, the validity of the vote is in question.

Signing contracts before the vote. Trustees occasionally accept quotes and start work on the assumption the resolution will pass. If it does not, or is later challenged, the scheme (and potentially the trustees personally) may be bound by a contract the scheme had no authority to enter into. The practical guidance in what to get in writing before work starts applies here directly.

If your scheme is at the quote-gathering stage, it helps to have comparable, written proposals to attach to the resolution notice. Request up to three vetted installer quotes — no obligation, and having them ready makes the approval process cleaner.

Ongoing Governance After Approval

Passing the resolution is the beginning, not the end. Once the system is installed, the body corporate needs to decide:

Governance itemWhy it matters
Water-quality testing scheduleSANS 241 (2024 edition) is South Africa’s drinking-water quality standard; stored water used for drinking or cooking should be tested to confirm it meets relevant parameters
Maintenance responsibilityPumps and tanks are common property infrastructure; the levy structure should cover routine servicing
Metering and cost allocationIf some units draw more backup water than others (e.g., ground-floor units vs upper-floor units on a gravity system), a fair allocation method should be recorded
Contractor access rightsThe management rules or house rules should give the body corporate the right to access pump rooms and tank areas for servicing

Estates and larger sectional title developments face additional complexity — the considerations in backup water systems for estates and sectional title properties are worth reviewing before the installation design is finalised.

For body corporates with commercial components — retail, office or mixed-use — the guide to water solutions for body corporates covers how commercial and residential levies should be separated when shared infrastructure serves both. The broader range of commercial water solutions available to larger schemes is also worth understanding before the design stage.

Before the AGM agenda is set, make sure you have written, itemised quotes to attach to the resolution notice — it is one of the most scrutinised documents in a CSOS dispute. Get comparable quotes from vetted installers and go into the vote with the full picture.

Practical Checklist Before the Meeting

To summarise what a body corporate should have in hand before calling the vote:

  1. Confirm whether the work requires a special or unanimous resolution by reviewing the scheme’s registered management rules.
  2. Obtain at least two written, itemised quotes and select the one to recommend (or put more than one to the vote).
  3. Draft the resolution in precise terms: system type, capacity, location, approved cost ceiling, and how the cost will be funded.
  4. Prepare a financial annexure showing the levy impact per unit over the repayment or special-levy period.
  5. Issue the notice at least 30 days before the meeting (more if your rules require it), with the resolution wording, motivation, quotes and financial annexure attached.
  6. Include proxy forms.
  7. Only execute the contract with the installer after the resolution has passed and been recorded in the minutes.

That sequence is not bureaucracy for its own sake. It is what gives the installed system a solid legal foundation — and what protects trustees from personal liability if anything later goes wrong.

Quick answers

Can trustees approve a water tank installation without a resolution if the cost is under a certain amount?

It depends on the thresholds in the scheme's registered management rules and the approved annual budget. Many schemes allow trustees to approve maintenance expenditure up to a specified rand limit without a resolution, but adding new infrastructure is generally treated as an improvement rather than maintenance, which typically requires owner approval regardless of cost. Check your specific rules and, if in doubt, seek a ruling from the CSOS before committing.

What percentage of owners must vote in favour for a special resolution to pass?

Under the STSMA and PMRs, a special resolution requires votes in favour from owners holding at least 75% of the total participation quota value, with no more than 25% of the total value voting against. Abstentions do not count as votes against, but they also do not help reach the 75% threshold. The count is based on all members, not only those present or represented at the meeting.

Can a special resolution be passed by email or written consent rather than at a meeting?

The PMRs allow certain resolutions to be passed by round-robin written consent, but the procedural requirements are strict and differ from those for a meeting. Special resolutions involving improvements to common property are generally expected to be tabled at a properly convened general meeting where owners can ask questions. Using written consent for a decision of this size carries risk of a successful CSOS challenge if any owner objects to the process.

What happens if trustees sign a contract before the resolution is passed and the vote fails?

This is a serious problem. If a contract is signed before owner approval and the resolution is not passed — or is later set aside — the scheme may still be bound by the contract depending on how it was executed, while the trustees who signed it may face personal liability. The CSOS can hear complaints about trustees who act outside their authority. Always obtain the resolution first, then execute the contract.

Does water stored in a communal tank need to meet SANS 241?

SANS 241 (2024 edition) is South Africa's national drinking-water quality standard, and it applies to water intended for human consumption. If the communal tank will supply water used for drinking or food preparation, the body corporate should have the water tested against relevant SANS 241 parameters and implement any treatment the test results indicate is necessary. The principle is straightforward: test first, treat second, and keep records of both.

Sources & notes

Pricing reflects typical Johannesburg market ranges and is confirmed by installer quotation. References: Community Schemes Ombud Service · gov.za